The following points must be noticed when installing the lift:

1. Carefully compile a special construction plan for installation and construction, and provide safety technical information to the installers.
2. Make the foundation according to the basic plan, pay attention to finding, leveling, and correcting the point to ensure the level of the foundation and various requirements for use.
3. Keep the access roads of external construction elevators smooth and have enough space for parking equipment. When auxiliary installation with a steam crane is required, full consideration should be given to whether the site environment meets the operating conditions of the steam crane.
4. To ensure excellent power supply at the installation site, install a separate distribution box, and the electric leakage switch must meet the requirements of the construction elevator when the distribution box is used. If the installed construction elevator is controlled by frequency conversion, it should be connected with frequency conversion when selecting the leakage switch Adaptor.